Wang, Xiang, Xiu, Qiu, and Si name five qualitative relations between a line element and the month element. They are labels, not numbers to average.

The exact matrix

StateWorking EnglishElement relation
WangProsperousline element = month element
XiangSupportedmonth generates line
XiuRestingline generates month
QiuConstrainedline controls month
SiDeadmonth controls line

“Dead” is the inherited technical label for one seasonal relation. It is not a literal statement about a person, event, or permanent condition.

One-month checksum

Use Chen month, whose element is Earth. Each possible line element occupies one state:

Line elementRelation to Earth monthState
EarthsameWang
MetalEarth generates MetalXiang
FireFire generates EarthXiu
WoodWood controls EarthQiu
WaterEarth controls WaterSi

This five-row checksum is enough to expose a reversed arrow. If Wood is marked Si instead of Qiu, you treated “line controls month” as “month controls line.”

Case 00035

The Chen/Earth month produces:

LineElementSeasonal state
1WaterSi
2WoodQiu
3EarthWang
4MetalXiang
5EarthWang
6WaterSi

Line 5 also carries a separate Month-Broken flag because Xu clashes Chen. Do not change its seasonal label to hide the clash, and do not erase the clash because the seasonal label is Wang. The fields answer different questions.

Practice

Choose any month branch, convert it to an element, and classify one line of each element. Your worksheet passes when:

  1. all five states appear exactly once;
  2. each directional sentence can be checked against the generation/control cycles;
  3. no numeric score or outcome has been added;
  4. exact branch flags remain in separate columns.

Stopping condition

Seasonal state is one input to later strength analysis. It does not select the target, override Month Breaker, settle a day-clash dispute, or decide an outcome by itself.

Source note

The complete matrix defines the five qualitative seasonal categories used by this course. The Case 00035 worksheet shows each element-to-season relation so the classifications can be checked directly.

Next: Proceed to Act 4: Target Selection with a completed, auditable construction worksheet.